Be Sure Your 2011 PEP Application is a 2011 Application!
The PEP grant application/RFP for 2011 is very similar to the application for 2010, however, some changes have been made since the last competition. Note that all RFP changes—large or small—are important! Be sure you submit an application that is developed and assembled based on the newest PEP RFP to ensure you are in a position to score as many points as possible. You can obtain a copy of the official RFP at http://www2.ed.gov/programs/whitephysed/applicant.html.
The most notable changes this year are the deadline, submission mode, and Selection Criteria.
- The 2011 PEP deadline is May 13, 2011. If you assume the deadline is the same as 2010 (July 19), you’ll miss the application period by more than two months.
- In 2011, applicants must submit their grants using grants.gov rather than e-grants.ed.gov as required last year. Register your organization now for a grants.gov account, or update your existing account to ensure a smooth and timely submission.
- Among the Selection Criteria, one criterion from 2010 has been removed (the criterion referencing target population previously placed in section B2), and two new criteria have been added. Below are the Selection Criteria for 2011 PEP according to pages 33-35 of the RFP. Criteria B2 and C2 are new this year. See the RFP for notes on what should be included to respond to each criterion.
Selection Criteria
(A) Need for the Project.
(1) The extent to which specific gaps or weaknesses in services, infrastructure, or opportunities have been identified and will be addressed by the proposed project, including the nature and magnitude of those gaps or weaknesses. (10 Points)
(B) Quality of the Project Design. (40 Points)
(1) The extent to which the goals, objectives, and outcomes to be achieved by the proposed project are clearly specified and measurable. (10 Points)
(2) The extent to which performance feedback and continuous improvement are integral to the design of the proposed project. (10 points)
(3) The extent to which the proposed project is designed to build capacity and yield results that will extend beyond the period of Federal financial assistance. (10 Points)
(4) The extent to which the proposed project will be coordinated with similar or related efforts, and with other appropriate community, State, and Federal resources. (10 Points)
(C) Quality of the Management Plan. (30 Points)
(1) The adequacy of the management plan to achieve the objectives of the proposed project on time and within budget, including clearly defined responsibilities, timelines, and milestones for accomplishing project tasks. (15 Points)
(2) The extent to which the time commitments of the project director and principal investigator and other key personnel are appropriate and adequate to meet the objectives of the proposed project. (15 Points)
(D) Quality of the Project Evaluation. (20 Points)
(1) The extent to which the methods of evaluation are thorough, feasible, and appropriate to the goals, objectives, and outcomes of the proposed project. (10 Points)
(2) The extent to which the methods of evaluation will provide performance feedback and permit periodic assessment of progress toward achieving intended outcomes. (10 Points)